none
Reporting in 3 users Lightswitch Application RRS feed

  • Question

  • Hi, I'm a new Lightswitch user. I "developped" a small Lightswitch application with approx. 5 entities which works great. This Framework is really ease to use. For the reporting of the small application I have to print out one A4 sheet. This print out should only show one main record and its dependency records. I checked a lot of 3rd party tools and found for almost every thing a good suite. The only grapical component I didn't find was a graph that shows 2 dimensions. One is the timeline the other the tasks with it's successor/antecessor (1 tasks has only none or one successor/antecessor) and the graph shold show the tasked based on the entered duration (from/to). Something like an MS Project chart but with much much less information.

    I don't want to try a calendar control, because I want to show a flexible time rage, with not to much overhead.

    So a task has

    -description (show be shown in the print out of the task)
    -duration (from/to)

    Should I buy a third party tool or do I have to try to develop a small c#-reporting application with an interface?

    Thank you very much


    • Edited by MikekiMike Saturday, August 11, 2012 12:11 PM
    Saturday, August 11, 2012 12:08 PM

Answers

All replies