What is the best approach to move a single project from tfs 2015 to tfs 2017 (different server)

    Question

  • I have 2 different tfs server setup , one runs with tfs 2015 other with tfs 2017. I need to move a specific project from 2015 to the 2017 instance. Please guide me with the best approach that we can go with...
    Thursday, April 06, 2017 6:11 PM

All replies