  • Question

  • We run a 2008 R2 forest with 2 subdomains.  2008 R2 functional level.  We want to move to 2016, but I am a little confused on the path.  We are 100% virtualized as far as DCs go.  Our plan is to upgrade the schema to 2016 by introducing the first 2016 DC and then replacing DCs one by one.  I would rather not go from 2008 R2 - 2012 - 2016 if possible.

    Is this scenerio feasible?

    Thanks