Hi team,
I have one load test, that contains 2 scenarios inside that. 10 web tests in each scenario.
Senario1 Settings: Constant load with 1 user,
Test mix model is based on sequential test order,
Agents to Use set to one agent.
Senario2 Settings: Constant load with 1 user,
Test mix model is based on sequential test order,
Agents to Use set to one agent.
am expecting those two scenarios should run parallel and each should run all web tests minimum of one iteration.
is it possible? if yes, how should I specify the settings?
Thanks,
9.