Just wanted some advice on this.
We bought VS2012 when it was first released (through normal retailer channels not through MSDN etc) and immediately had some problems with it, It was only when update 3 was released and installed that most bugs had disappeared.
Now in a period of short time VS2013 is now available, would this allow existing VS2012 customers to upgrade or is there a fee to be paid?
Are there major differences between the two that i should think that having VS2013 is a lot better than 2012 and is a must?
If we upgrade one machine to VS2013 woudl it be compatible with existing VS2012 projects or is it the same that the project is tied in with that version of VS/.Net?