none
Excel Timeline RRS feed

  • Question

  • I have made a timeline where the date is entered along with a title and then a heading height (above or below) the baseline. 

    I was wondering if it possible to have text above AND below the baseline on the same date?

    Friday, February 23, 2018 11:55 AM

All replies