locked
Test plan reporting for build test results RRS feed

  • Question

  • Hi!

    I'm trying to get decent reporting in a test plan based on the results the test results in a build, but I can't quite make the connection between test plan and test runs in a build context.

    The situation is as follow:

    1. I'm building a solution that contains integration tests that make out the regression suite for a system

    2. When this builds it creates a nice report in the test > runs section

    3. I'd like to make a connection between each unit test in the solution and a corresponding test case in a test plan.

    4. This relationship can be set through visual studio, but I can't see any way of getting the build to report directly into the test plan for this test cases.

    Is this possible? Is this intended?

    Thanks!

    Tuesday, March 15, 2016 2:52 PM

Answers