  • Currently in my workflow I have a step that if an item is created between two months it will copy into a doc library. So if I set it up so an item that is created between March 1, 2011 to April 1, 2011 it will do that. What I want to do is set the dates up so I don't have to go in after this year(2011) and change each date to 2012 and instead it will change it automatically/dynamically.