I understand that since such properties are missing on the BFT object we cannot prioritize downloads? So the only option left is to have our own queue and in case a high priority download is pushed into the queue, the current low-prio download is paused/canceld?
Is there a way to pause downloads?
Is there a way to resume downloads?