none
Can two HCK projects run at the same time? RRS feed

  • Question

  • Hello All,

    Lets say I have two HCK projects, one project named MPIO that is using machine pool MPIO in which is a system named LEADER and the other project is named iSCSI that is using machine pool iSCSI in which is a system named PACKRAT. Can I run both of these projects at the same time from the same HCK Studio & Controller?

    Thanks in advance,

    JimH

    Saturday, January 25, 2014 3:00 AM

All replies

  • Yes. you will be able to schedule tests simultaneously on both the projects. are you facing any issues?


    Thanks, Krishna

    Saturday, January 25, 2014 6:12 AM
  • Hi Jim,

    You can run N no of projects in parallel provided that your SUT must be attached to one project only not with multiple projects.

    Thanks,

    Mudit

    Monday, January 27, 2014 4:03 AM
  • Yes, you can run the same project at the same time.  For ease of management, you may want to separate out the machine pools, but there is not required.  Thanks.


    This posting is provided AS IS with no warranties, and confers no rights.

    Monday, January 27, 2014 4:35 PM